top of page
Meeting at the office

Insights

Search
2016-2017
2017 Summer

Independent Review of Hydraulic Modeling for Aliso Canyon Risk Assessment

Independent Review Team (IRT) with the Los Alamos National Labs (LANL) that reviewed hydraulic modeling methods used by SoCalGas to ensure reliability of the natural gas transmission system which in turn affects power generation and reliability of power to the Los Angeles CA basin.

bottom of page